By VOITA Power Engineering Team · Last updated
A Starlink Power Adapter That Ships Complete: Dual Input, Dual Output, and the Screws in the Box
The complaint that started this project was a missing screw, not a missing watt.
The adapter worked. What it did not do was arrive ready to install: the mounting screws were bought separately, and the input connector was fixed, so every site that wired its terminal differently needed a different version of the same product.

The application: one terminal, many ways to feed it
One terminal, many ways to feed it. A satellite terminal installation is not a factory-built assembly. It is a supplier’s adapter, an installer’s cable and whatever power source the site already has. Two sites in the same city can terminate the same product completely differently, and both are correct.
Two outputs, two loads. The adapter carries the terminal and the equipment beside it. Splitting that across two outputs keeps the DC side in one box instead of adding a second converter and a second set of terminations at the mast.
The install is a visit, not a project. Someone drives to a site, climbs, mounts and terminates. If a part is missing, the visit is repeated — and the cost of the repeat is a hundred times the cost of the screw.
The constraint
Three requirements, and the obvious answer to each one made the others worse.
1. The wiring differs by site. A fixed input connector means one model per termination style. Two styles becomes two models, then four, and the catalogue grows faster than the sales do.
2. One SKU has to cover the field. Distributors will not stock a variant matrix for a single accessory. Whatever is on the shelf has to fit the next installation, not the last one.
3. The box has to be complete. Screws, gaskets and harness are not optional extras at the point of installation. If they are ordered separately, they arrive separately — or they do not arrive.
The trap is that the natural fix for problem one is a set of adapter cables, and the natural fix for problem three is a second order line. Both move work from the factory to the least convenient place to do it: the top of a mast.
Our call: move the choice to the installer
We moved the choice from the catalogue to the installation. Instead of building a model for each connector standard, the unit carries two inputs, and the installer selects the one the site uses. The variant list collapses to one part number.
We treated the hardware as part of the product rather than an accessory. If the unit cannot be mounted without screws and gaskets, then screws and gaskets are components of the unit, and they belong in the same carton as the unit.
That is the whole judgement in this project: the expensive failure was never an electrical one. It was a second site visit for a part that costs less than the fuel to reach the site.
What we built
The adapter is built around two inputs and two outputs, with the mounting hardware packed with the unit rather than alongside it on the order.
| Item | Provision |
|---|---|
| Input | Two connector standards on the same unit, selected at installation |
| Output | Two DC outputs |
| Mounting hardware | Screws and gaskets packed with every unit |
| Harness | Packed in the same carton |
| Carton | One unit, one carton, one purchase line |
Two inputs on one unit is a mechanical and a documentation problem before it is an electrical one. Both sockets have to be reachable on the mounting face, only one is wired at a time, and the label has to make that unambiguous to somebody working in the dark with cold hands. The second socket is a choice, not a second feed.
The one question that changes the product
If both inputs could ever be live at once, that is a different product.
Two sockets selected by the installer is a configuration question. Two feeds connected simultaneously is an arbitration question — the unit has to decide which source wins, what happens when the weaker one sags, and how the changeover is reported. That rule belongs in the specification, not in a cable.
It is the first thing we ask on a project like this, because the answer changes the board. A site that will never have two feeds does not need to pay for the logic; a site that will, needs it designed in.
What we did not do
We did not ship a bag of adapter cables. It looks cheaper on the quotation and it creates the exact failure this project was meant to remove: a part that can be lost, connected wrongly, or left in the van.
We did not build a second model for the other connector standard. It would have solved one site and doubled the stock problem for the distributor.
We did not keep the hardware as a separate line item. Anything that must be present for the unit to be installed belongs inside the carton, not on the packing list of a second supplier.
Result
One part number, one carton, one visit.
The distributor stocks a single adapter instead of a variant list, and the installer opens one carton that contains everything needed to mount it. The site wiring decides how the unit is connected, not which unit has to be ordered.
If you are specifying something similar
Four questions decide whether a dual-input adapter is the right answer for your installations:
- Which connector standards are actually in the field, and in what proportion. Two standards that split 50/50 justify two inputs on one unit; one rare standard does not.
- Whether the two outputs are loaded at the same time, and at what share. Simultaneous full load is a thermal question, not a socket count.
- Whether both inputs could ever be live simultaneously. If yes, the changeover rule has to be designed, not improvised at the mast.
- How the unit is mounted and by whom. If the installer supplies the fasteners, the carton does not need them. If the installer is on a deadline, it does.
Every converter we ship carries a 2-year warranty. If you are putting power on a satellite terminal, tell us the connector standards you meet in the field, how the two outputs are loaded and how the unit is mounted. We will tell you whether one complete kit replaces your variant list, or whether your sites genuinely need two products.